ForgeApply
Try it free

ForgeApply · Job listing

Release Train Engineer

Dynata

Remote · US$95k – $115k

See all 15 open roles at Dynata

Tailor your resume for this Dynata job in about a minute.

ForgeApply tailors your resume and cover letter to this exact posting, then hands you a ready-to-submit application for Dynata's site. Free trial, no card required.

About this role

Lead, facilitate and coordinate the operation of the Agile Release Train (ART), ensuring quarterly synchronization between business and technology in assigned programs. Facilitate PI Planning events (pre-PI refinement, the 2-day event, Confidence Vote and ROAM exercise), the cross-team ceremonies during the increment (Scrum of Scrums, PO Sync, ART Sync and System Demo) and the Inspect & Adapt workshop at PI close — ensuring plan compliance, cross-team dependency management and predictable delivery of business value in every Program Increment.

DIRECTLY INVOLVED IN THE FOLLOWING PROCESSES • Agile coaching services and SAFe framework adoption.

• Facilitation and governance of PI Planning events.

• Management of the ART operating rhythm (cross-team ceremonies).

• Continuous improvement at program level (Inspect & Adapt).

• Health, safety and work environment compliance.

Key Processes Supported  

• Agile coaching and   SAFe   adoption  

• PI Planning governance and facilitation  

• ART operating rhythm management  

• Program-level continuous improvement  

• Health, safety, and workplace compliance  

ROLE REQUIREMENTS

• Bachelor’s degree in Computer Science , Engineering, Business Administration, or related field  

• Preferred graduate-level education in Agile Project Management, Organizational Transformation, or related disciplines  

• Minimum two (2) active SAFe / Agile certifications (SAFe RTE preferred).

• 5+ years leading software delivery programs  

• 2+ years coordinating multiple teams at the program level  

• Minimum 3 PI Planning events facilitated or co-facilitated in any prior context.

KNOWLEDGE AND SKILLS — TECHNOLOGIES • Backlog and planning: Jira (including Jira Plans), Azure DevOps, Linear. Familiarity with Dynata two-Jira-project model (PM board and Engineering board).

• Visualization and Program Board: Miro, Mural, Lucidchart, Aha! Roadmaps.

• Documentation and knowledge management: Confluence, Notion, SharePoint, Microsoft 365, Google Workspace.

• Communication and collaboration: Microsoft Teams, Slack, Zoom, Google Meet.

• Live polling and surveys: Mentimeter, Slido, Poll Everywhere (for Confidence Vote and PI Planning dynamics).

• Metrics and dashboards: Tableau, Power BI, Jira Dashboards, EazyBI (reading and interpreting Predictability, Flow and Business Value metrics).

• Spreadsheets and modeling: Excel, Google Sheets (Sprint Capacity Planner, capacity debt tracking, ad-hoc analysis).

• Frameworks and methodologies: SAFe 6.0 (ART, Program Increment, PI Planning), Scrum, Kanban, Lean. Working knowledge of Dynata Product & Engineering Process (V1, May 2026).

GENERAL RESPONSIBILITIES These are the strategic, ongoing accountabilities of the role. They apply continuously across every Program Increment. The responsibilities are grouped in two blocks: SAFe-canonical (what any RTE does anywhere) and Chapter-specific (what an RTE at Dynata does within the Chapter structure).

SAFe-canonical responsibilities • Own the ART operating rhythm end-to-end. The RTE is the single accountable owner of every cross-team ceremony that operates above the sprint level: pre-PI refinement, PI Planning, Scrum of Scrums, PO Sync, ART Sync, System Demo and Inspect & Adapt.

• Be the single point of escalation for cross-team dependencies and impediments within the ART. Teams escalate to the RTE; the RTE escalates upward only when a decision is needed above the ART level.

• Maintain the Program Board as the source of truth for what every team is committed to in the current PI. The Program Board is the RTE's primary artifact — updated by them or by named delegates, never left stale.

• Coach the PEMs, Tech Leads and Product Managers of the ART on the SAFe operating model. Coaching is delivered through observation, feedback and structured 1-on-1s — not through training events.

• Hold the trust relationship with the Business Owners of the ART. Business Owners must believe the RTE is operating in service of business outcomes — this is the precondition for BO commitment to 2-day PI Planning attendance and to honest Business Value scoring.

• Track and report Predictability, Flow and Business Value metrics for the ART. Where dashboards are not yet in production, the RTE owns interim manual reporting.

• Facilitate the Inspect & Adapt workshop at PI close and drive the resulting improvement backlog into the next PI. Continuous improvement at ART level is an RTE-owned outcome.

• Manage the ART's interfaces with adjacent teams, vendors and strategic initiatives. When dependencies cross the ART boundary, the RTE is the named liaison.

Chapter-specific responsibilities (Dynata Agile Chapter) • Report weekly to the Chapter Lead on ART health — Predictability trajectory, in-flight impediments, cross-team dependencies at risk, capacity debt balance, upcoming decisions.

• Participate in the monthly Chapter Council (90 minutes). Bring cross-ART issues, template evolution proposals, community-of-practice status.

• Coordinate with peer RTEs as additional ARTs stand up. When features or capabilities span multiple ARTs, peer RTEs collaborate on synchronization — chair-rotated between RTEs.

• Contribute team-level and ART-level data to the Metrics & Reporting Steward for the Chapter's cross-ART dashboards.

• Support the PEM Community Lead and the Agile Team Coach when they need ART-specific input for their communities of practice.

• Own the ART's contribution to the Chapter's rolling 12-month roadmap: onboarding of new teams, tooling improvements, capacity for training or certification.

• Represent the ART at the Chapter Lead's quarterly review with the CPO and Executive Sponsor.

SPECIFIC RESPONSIBILITIES Pre-PI refinement (Weeks 1–6 of the PI cycle) • Facilitate the weekly pre-PI refinement cadence per team: 60-minute session where PM, PEM and Tech Lead jointly groom the top-priority features for the next PI. Required output per team: features sized, acceptance criteria written, depen

Tailor your resume for this Dynata role before you apply.

Tailor my resume for this job

Similar jobs

Free ATS checker · How to Tailor Your Resume to a Job Description (Step by Step)